Skip to main content
    July 21, 2026•3 min read

    A Flat, Dry Subfloor Comes First: What Installers Check

    KH
    Kyle Hedin

    Flooring Expert & Author

    A Flat, Dry Subfloor Comes First: What Installers Check — flooring tips for Waukesha, WI homeowners

    A new floor is only as good as the subfloor under it, which is why the subfloor is checked for two things before flooring goes down: is it flat, and is it dry. Both are fixed more easily before the new floor is installed than after. This is how installers think about each check, and what you can ask about at your estimate in Waukesha or anywhere in our service area.

    Flatness

    Bob Goldstein, writing in Hardwood Floors magazine, says a subfloor for nailed wood floors should be flat to within a quarter inch in 10 feet, or 3/16 of an inch in 6 feet. He also cites a stricter general industry standard of 3/16 of an inch in a 10-foot radius, or 1/8 of an inch in a 6-foot radius. Other flooring types and manufacturers set their own tolerances, so the instructions for your product decide the number.

    The method is simple. Lay a straightedge across the floor and mark the high spots and low spots. On a concrete subfloor, Goldstein says you grind off the high areas and fill the low ones, preferably with a quality self-leveling Portland-based product. Small dips, holes or cracks can be trowel-filled. His advice to contractors is to pay close attention to subfloor flatness before taking on the job.

    Moisture in a wood subfloor

    For solid wood flooring, moisture in the subfloor matters because the two materials should be close to each other. Roger Barker writes in Hardwood Floors magazine that solid strip flooring under 3 inches wide should be within 4 percentage points of the wood subfloor's moisture content, and solid plank flooring 3 inches or wider within 2 percentage points. He also says subfloors should be tested for moisture, and that over a crawl space or unfinished basement the conditions below and above the subfloor should be checked and recorded.

    Moisture in a concrete slab

    Concrete is tested differently. ASTM F2170 is the standard method for measuring relative humidity inside a slab, and it notes that results reflect only the time and locations tested. Our article on basement flooring covers it in more detail.

    Why we treat prep as its own step

    Our FAQ lists a six-step process, and the third step, subfloor prep and repairs, comes before any flooring is installed. If you already know about a squeaky area, a soft spot, a past leak or an uneven stretch, tell the installer at the estimate. We offer subfloor preparation and repair as a service for exactly this reason.

    What to ask

    • How do you check the subfloor for flatness, and what tolerance do you work to?
    • Do you test moisture in the subfloor, and will you record the readings?
    • If the subfloor needs work, how is that priced and scheduled?

    Call (262) 683-5301, Monday to Friday, 9 AM to 5 PM, or request a free estimate and we will look at the subfloor with you.

    Sources

    KH
    Kyle Hedin

    Kyle Hedin is the founder of Illustrious Flooring in Wales, Wisconsin, specializing in high-quality hardwood, LVP, and laminate flooring installations. With over 10 years of experience in the flooring industry, Kyle brings expert craftsmanship and a keen eye for detail to every project in Waukesha County and Southeast Wisconsin. His commitment to clear communication and client satisfaction sets Illustrious Flooring apart.

    Planning a Flooring Upgrade?

    Get a clear, honest quote from Illustrious Flooring.

    Call Us